Microsoft Project Online · Retirement & migration
Project Online Retirement Consulting & Migration
Protect your project data. Preserve your business processes. Move forward with a clear migration plan.
BSUITE365 helps you assess your Project Online environment, evaluate replacement platforms, and manage migration, redesign and archive work before September 30, 2026.
PMO, IT and business teams · Canada & United States
The retirement deadline
September 30, 2026Protect what your business depends on.
Project Online access ends at retirement. Required information should be migrated, exported or archived—and validated—before shutdown.
View Microsoft’s retirement noticeStart here
Project Online retirement at a glance
Understand what is at risk, who should be involved, and where to begin.
Retirement date
Microsoft Project Online officially retires on September 30, 2026. Organizations must migrate, export or archive required information before the service becomes unavailable.
Who should act
PMOs, IT departments, Microsoft 365 administrators, reporting teams and business owners should act if they rely on Project Online for schedules, resource management, timesheets, portfolio reporting, project intake, approval processes, project sites or system integrations.
What should be inventoried
The inventory should cover all Project Web App (PWA) sites and their active, completed, draft and historical projects. It should also include enterprise resources, assignments, custom fields, lookup tables, timesheets, project sites, documents, reports, workflows, permissions, integrations and retention requirements.
Does Microsoft provide an automatic migration?
Microsoft documents limited native and import capabilities for moving project data into Planner, and Microsoft partners offer broader Project Online migration solutions. Tool availability and supported object types must be confirmed for the customer’s tenant, destination and licensing.
Recommended first step
Begin with a Project Online retirement-readiness assessment. The assessment should identify critical data and dependencies, confirm what must remain operational, and define what should be migrated, rebuilt, archived or retired. If time is limited, protecting and validating critical source data should be the first priority.
Key changes
What the retirement means for your environment
Microsoft has confirmed that Project Online will retire on September 30, 2026. Until then, existing environments can continue to operate, but the remaining time should be used to understand what to do. Several related Microsoft changes also affect retirement planning:
Project Online-only SKUs reached end of sale for new customers on October 1, 2025
Microsoft ended sales of Project Online-only SKUs to new customers on October 1, 2025. Existing customers can continue using supported Project Online environments until the September 30, 2026 retirement date.
Project Online access ends on September 30, 2026
After the retirement date, users will no longer be able to access their projects or associated Project Online data within the service. Important operational and historical information should therefore be migrated, exported or archived in a usable format before shutdown.
New PWA-site creation was blocked on April 1, 2026
As of April 1, 2026, Microsoft blocked creation of new Project Online PWA site collections. It also blocked Project Online access for tenants that did not contain at least one project across any existing PWA site. Organizations must therefore plan from their current environment rather than assume that a new Project Online instance can be created for transition work.
SharePoint 2013 workflows in SharePoint Online were removed from existing tenants and fully retired on April 2, 2026.
SharePoint 2013 workflows were fully retired in SharePoint Online on April 2, 2026. If a Project Online environment relied on that workflow engine for project creation, approvals, stage gates or notifications, those processes require separate attention now.
Required information should be protected before shutdown
Organizations should identify what must remain operational, what can be retained for reference and what can be retired. This includes project schedules, baselines, enterprise custom fields, resources, timesheets, project-site content, reports, workflows, integrations and security rules. The assessment should determine whether each site, subsite, list or library resides inside the PWA site collection or in an independent SharePoint site collection.
Know the distinction
What is retiring—and what is not?
Project Online, Project Web App, Project for the web, Microsoft Planner and Project desktop are connected parts of the Microsoft project-management ecosystem, but they are not interchangeable.
| Product or experience | Current status | What organizations need to know |
|---|---|---|
| Project Online | Retires September 30, 2026 | This is Microsoft’s SharePoint-based cloud project and portfolio-management service. Its projects and associated Project Online data will no longer be accessible through the service after retirement. |
| Project Web App (PWA) | Hosted by Project Online retires with the cloud service. | PWA is the browser-based interface and administration environment used with Project Online. In this context, PWA means Project Web App. |
| Project for the web | User experience retired in August 2025; its capabilities continue through premium plans in Microsoft Planner. | Existing Project for the web premium plans remained in Dataverse and became accessible through Planner without data migration. Project for the web was separate from Project Online; this transition did not migrate Project Online projects into Planner. |
| Microsoft Planner with premium capabilities | Current Microsoft cloud work-management option | Additional design may be required to reproduce broader PPM governance, reporting or integration needs. |
| Microsoft Project desktop | Not retired by the Project Online announcement | The desktop scheduling application remains available. However, organizations must distinguish the desktop application from its connection to Project Online, and individual perpetual releases have their own lifecycle dates. |
| Project Server Subscription Edition | Separate, self-managed Microsoft platform | Project Server Subscription Edition requires SharePoint Server Subscription Edition Enterprise, supported Windows Server and SQL Server infrastructure, Project Server licensing, patching, backup, monitoring, availability and security administration. |
| Dynamics 365 Project Operations | Separate Dynamics 365 business application | This may fit project-based organizations that need to connect project delivery with resources, time, expenses, contracts, cost and billing. It is broader than a schedule migration. |
Beyond the schedule
Protect the processes around your projects
The effect of retirement depends on how deeply Project Online is connected to day-to-day project delivery.
Loss of access to project information
Active schedules are only part of the picture. Project Online may also contain completed projects, baselines, enterprise custom fields, calendars, milestones, resource assignments, timesheets and portfolio metadata.
Disruption to PMO governance
Many organizations use Project Online to control how work enters and moves through the portfolio. Enterprise project types, project-detail pages, intake forms, stage gates, approvals and lifecycle rules may not exist in the same form in a replacement platform.
Reporting interruption
Power BI models, Excel reports and executive dashboards may depend on Project Online OData feeds, custom views or scheduled extracts. Moving schedules without redirecting and validating these data connections can leave leadership without trusted portfolio reporting.
Workflow and automation failure
SharePoint Add-Ins and Azure ACS-based authentication for SharePoint Online stopped working on April 2, 2026. Consequently, Add-Ins and integrations that still depend on ACS should now be treated as failed dependencies. This retirement does not retire SharePoint CSOM or REST themselves; integrations using those APIs must be assessed according to their authentication model and supported implementation pattern.
Resource-management gaps
Enterprise resource pools, skills, and utilization reports can influence staffing decisions across many projects. A target platform may model these concepts differently, so resource-management requirements should be evaluated separately.
User-adoption risk
A technically successful migration can still create confusion if project managers, team members, PMO analysts and executives do not understand the new terminology, responsibilities and working methods.
Time is limited
Need a contingency plan before retirement?
Start with a critical-data protection review to identify what must be exported and validated first.
How we help
Our Project Online retirement consulting services
BSUITE365 can support the full transition or a focused part of it. We begin with the current business process and technical environment, then help define what should be migrated, rebuilt, archived or retired.
Project Online Environment Assessment
The Project Online Environment Assessment looks at all active and historical PWA instances, including active, completed and archived projects, as well as ownership structures.
Replacement-Platform Evaluation
The Replacement-Platform Evaluation focuses on identifying the most suitable future solution based on actual business requirements rather than defaulting to a single Microsoft product. It compares different platforms against criteria such as scheduling capability and user experience.
Target Solution Architecture
The Target Solution Architecture defines how the future system will operate as a complete, connected environment.
Project Online Data Migration
Project Online data migration is performed in controlled stages. Depending on the required data and destination platform, extraction may include Project schedules, supported CSOM or REST data, PWA configuration and SharePoint project-site content. Schedule migration and SharePoint-content migration are treated as separate workstreams.
Workflow and Automation Modernization
Workflow and Automation Modernization focuses on improving or replacing existing processes rather than simply replicating them in a new system.
Power BI and Reporting Migration
Power BI and Reporting Migration ensures that critical business reporting continues to function after Project Online is retired. The process begins by identifying all reports, dashboards and datasets that depend on Project Online data sources such as OData feeds or custom extracts.
Training and Change Management
Training and Change Management ensures that users can effectively adopt the new system after migration. Because different roles interact with Project Online in different ways, training is tailored for administrators, PMO teams, project managers, executives and end users.
Cutover and Post-Migration Support
Before cutover, migration results, responsibilities, communications, contingency procedures and acceptance criteria are confirmed. If cutover occurs before Project Online retirement, the plan may include defined conditions for temporarily returning to the source system. The cutover plan also defines the authoritative system during each transition stage.
Choose your next platform
Project Online replacement & migration options
There is no universal replacement for Project Online. The best path depends on how your organization handles workflows. The options below are starting points for assessment, not automatic recommendations.
Look beyond a direct import
Is Microsoft Planner the right fit?
Microsoft Planner with premium capabilities can be a strong option for modern project execution. Depending on the license, premium plans in Microsoft Planner can provide Timeline view, dependencies, custom fields, People view, critical-path features and portfolios.
Portfolio intake and governance
Project Online environments may use demand management, enterprise project types, project-detail pages, stage gates, business cases and approval workflows. These processes may need to be recreated with Planner, Power Apps, Power Automate, Dataverse or another governance layer.
Resource and time management
Organizations that depend on enterprise resource pools, resource engagements, formal capacity planning, utilization reporting or timesheets should compare those requirements carefully with the capabilities and data model of the proposed Planner solution.
Cost, budget and project financials
Task progress and schedule management are not the same as budget control, forecasting, actual cost, revenue, billing or ERP integration. Financial requirements may call for Power Platform extensions, Dynamics 365 Project Operations, an ERP-led design or another PPM solution.
Enterprise data and reporting
Power BI reports built on Project Online OData will not continue unchanged simply because schedules move to Planner. Data structures, identifiers, refresh methods, history and security must be redesigned and tested against the new source.
Templates, fields and permissions
Multiple enterprise templates, calculated fields, lookup tables, complex permissions and department-specific governance may require configuration beyond a direct project import. Recreating every legacy field is rarely the best answer; each item should be tied to a current business need.
Cross-project and historical requirements
Cross-project dependencies, long-term baselines, portfolio history and audit reporting can be more difficult than migrating current task lists. These needs should be tested with representative data before the organization commits to a final target architecture.
Plan size and technical limits
Planner feasibility testing should also check published premium-plan limits, including task volume, hierarchy depth, custom-field count, resources, dependencies, duration and supported date range. Large or highly detailed Project Online schedules may require restructuring, division into multiple plans or a different target platform.
Make deliberate data decisions
Migrate, rebuild or archive?
Actual support depends on the destination platform, migration tool, licensing and data model. Schedule migration and SharePoint-content migration are separate workstreams.
Migrate
Move supported operational data
- Active schedules, tasks and dependencies
- Supported resources, assignments and fields
- Required SharePoint documents and list content
- Representative data validated through a pilot
Rebuild
Redesign the capabilities you still need
- Intake, stage gates and approvals
- Resource and capacity-management processes
- Power BI models, queries and security
- Templates, permissions and integrations
Archive
Keep history accessible and usable
- Completed or cancelled projects
- Historical baselines, timesheets and reports
- Audit and approval evidence
- Retained documents with access and retention controls
A structured transition
Our Project Online migration process
We use a phased process so platform, data and adoption decisions can be tested before the final cutover.
Discovery and stakeholder interviews
We meet with PMO, IT, reporting, finance, project-delivery and business stakeholders to understand how Project Online is used today. These conversations identify operational pain points, compliance needs, critical reports and goals for the future environment.
Environment and dependency inventory
We catalogue Project Online configuration, projects, resources, reports, automation, permissions, project sites and integrations. Each dependency is linked to an owner and business purpose so hidden reliance on the current platform becomes visible.
Requirements and gap analysis
We separate essential capabilities from obsolete or lightly used legacy configuration. Requirements are prioritized and compared with candidate platforms, highlighting where native capability, extension, integration or process change is required.
Target-platform selection and architecture
We compare realistic options using agreed criteria and define the future data, governance, automation, reporting, integration and security model. Licensing and operational ownership are considered before implementation begins.
Pilot configuration and test migration
We configure a controlled pilot and migrate representative projects—not only the smallest or cleanest examples. The test set should include important custom fields, dependencies, resources, reports and edge cases that could affect production.
Validation, reconciliation and user acceptance
We compare record counts, field values, schedule logic, assignments, documents, permissions, reports and workflow outcomes. Business users confirm that the new solution supports agreed scenarios, while differences and accepted limitations are documented.
Production migration, cutover and support
We complete final extraction and migration, communicate the change, activate the production process and support users through launch. Priority issues are triaged, reports and integrations are monitored, and the environment is handed over with current documentation.
Practical outputs
What you receive
The engagement produces practical decision, migration and support materials—not only meetings and technical activity.
Current-state assessment package
This may include the Project Online inventory, stakeholder and requirements summary, data-quality findings, dependency register and identified retirement risks.
Platform and architecture recommendations
Decision materials may include a feature-gap matrix, replacement-platform comparison, recommended migration path, target solution architecture and licensing considerations. Assumptions, constraints and items requiring proof-of-concept validation are recorded clearly.
Migration design and evidence
We can provide data-mapping rules, transformation logic, archive decisions, pilot results, exception logs, reconciliation evidence and user-acceptance records. Where information is archived rather than migrated, the archive design may include searchable schedule records, preserved identifiers and relationships, a data dictionary, retention controls, and a supported viewing or reporting mechanism.
Cutover and operational documentation
Cutover materials may include the migration schedule, responsibility matrix, communication plan, validation checklist, rollback criteria and issue-escalation process. Administrator documentation explains the future environment, ownership and recurring support tasks.
Training and post-launch plan
Role-based user materials, administrator guidance and a post-launch support plan help the organization move from implementation into stable operation.
Built around your team
Who needs Project Online retirement consulting?
Project Online retirement consulting is most valuable when the environment supports more than a small collection of standalone schedules.
PMOs managing enterprise schedules and portfolios
Consulting can help organizations that use Project Online for enterprise scheduling, cross-project reporting, portfolio prioritization, program oversight or standardized project templates. These environments typically need consistent data mapping and governance in the future platform.
Organizations with formal intake and approval processes
If new projects move through request forms, business cases, enterprise project types, stage gates or approval workflows, the transition must preserve the business decisions behind those steps—not merely their current SharePoint configuration.
Teams coordinating resources and time
Organizations using enterprise resource pools, resource engagements, capacity planning, assignments, timesheets or status reporting should validate how the target solution will support resource demand, availability and actual effort.
Leaders relying on portfolio reports
Power BI dashboards, Excel reports, OData queries and executive scorecards may depend on fields and relationships that will change during migration. Reporting users should be included early so the new data model continues to answer the questions they use to run the portfolio.
Environments with custom configuration or integration
Specialist support is particularly useful when Project Online connects to financial or ERP systems, uses custom fields and formulas, includes project sites and document libraries, or depends on custom workflows, APIs, scripts and security groups.
Organizations that have not selected a replacement
You do not need to choose Planner, Project Server, Dynamics 365 or a third-party PPM platform before asking for help. An assessment can separate essential requirements from legacy configuration and compare realistic options using the same evaluation criteria.
IT and Microsoft 365 Teams
We work with IT departments responsible for maintaining Project Online environments, SharePoint infrastructure, Power Platform integrations, and reporting systems.
Flexible engagement
Choose the right level of migration support
Not every organization needs the same engagement. The retirement-readiness assessment is usually the best starting point when important dependencies remain unclear.
Recommended starting point
Project Online Retirement Readiness Assessment
Best for: Organizations that have not completed an inventory or selected a destination platform.
We review the environment, clarify business requirements, identify dependencies and risks, and define the decisions that must be made before migration.
Request an AssessmentMigration Strategy and Solution Architecture
Best for: Organizations that understand their current environment but need help evaluating options and designing the future solution.
We compare platforms, identify feature gaps and define the target data, governance, reporting, automation, integration, security and licensing approach.
Discuss This EngagementEnd-to-End Project Online Migration
Best for: Organizations that need coordinated assessment, architecture, configuration, migration, testing, training, cutover and post-launch support.
We manage the transition as a connected program, with clear responsibilities and validation across business process, platform, data and user adoption.
Discuss This EngagementSpecialized Migration Support
Best for: Organizations managing the broader transition internally but needing focused expertise.
Support can focus on Power BI, workflow modernization, Planner and Power Platform, Project Server Subscription Edition, or cutover readiness.
Discuss This EngagementYour Microsoft technology partner
Why organizations choose BSUITE365
BSUITE365 brings these areas together so clients do not have to manage disconnected recommendations from separate technical specialists.
Microsoft ecosystem experience
Our work spans Microsoft Project, Microsoft 365, SharePoint, Power Platform, Power BI, Excel and Teams. This cross-platform perspective is important because a Project Online dependency may sit in a report, workflow, document library or business system outside PWA itself.
Business and technical consulting in one engagement
We work with PMO leaders and business users to understand why a process exists, while also reviewing the data structures, automation and integrations that make it work. This helps translate operational needs into a solution that technical teams can support.
Data, reporting and integration capability
Our scope can extend beyond interface configuration to data mapping, Power BI, workflow modernization, API integration and custom development. This is valuable when Project Online sits at the centre of a wider reporting or operational process.
Support for adoption and long-term ownership
We communicate with technical and non-technical stakeholders, create role-based documentation and help internal teams prepare to own the future environment. A migration is complete only when users can perform their work and administrators can support the solution.
Remote delivery across North America
BSUITE365 supports organizations across Canada and the United States through structured remote discovery, implementation, training and support. Sessions and deliverables can be coordinated across departments and locations.
Your questions, answered
Project Online retirement FAQs
When is Microsoft Project Online retiring?
Microsoft Project Online will officially retire on September 30, 2026. Customers can continue using it until then, but access will end afterward. Organizations should complete migration, reporting changes, workflow updates and user training before the deadline. September 30 is the end of service—not the start of planning.
What happens to Project Online data after September 30, 2026?
After retirement, Project Online data will no longer be accessible. This includes schedules, resources, assignments, reports and historical records. All required data should be migrated, exported or archived in advance. Organizations should also validate that exported data is complete and usable.
Is Project Web App retiring, and are Project desktop, Project Server or Microsoft Planner affected?
The Project Online-hosted Project Web App experience will become unavailable when Project Online retires. PWA remains available as part of the separately deployed Project Server Subscription Edition platform.
What is replacing Microsoft Project Online?
There is no single replacement for all environments. Microsoft is investing in Planner and its premium capabilities, but organizations with advanced governance, resource, reporting, financial or integration requirements may need Power Platform extensions or another PPM solution.
How do we choose the right replacement?
Start by documenting what Project Online currently supports, including scheduling, reporting, resource management, workflows and integrations. Then evaluate replacement options based on functionality, customization effort, integration needs, cost, security and long-term support. A proof of concept is often the most reliable way to decide.
Are premium plans in Microsoft Planner a direct replacement for Project Online?
Not always. Planner Premium supports core project tracking features like timelines, dependencies and portfolio views, which work well for many teams. However, it may not cover advanced PMO needs such as complex governance, financial tracking, enterprise workflows or deep reporting without additional tools.
Can Project Online data be migrated directly to premium plans in Microsoft Planner?
Schedules, tasks, dates, dependencies and selected task-level fields may be transferable, depending on the migration tool and plan limits. Native .mpp import does not preserve resources or several advanced scheduling objects, so resource assignments and other unsupported data may require separate migration or recreation.
What Project Online data and configuration can be migrated?
Items that may be migratable, depending on the destination platform, migration tooling and required fidelity, include projects, tasks, schedules, resources, assignments, selected custom fields, baselines and some documents or history.
Can workflows, approvals and integrations be migrated?
They usually need to be rebuilt rather than migrated. Each workflow or integration should be reviewed and mapped to modern tools like Power Automate or APIs. SharePoint 2013 workflows are no longer supported in SharePoint Online, so affected workflows must be replaced.
What happens to Power BI reports connected to Project Online?
Power BI datasets, Excel queries and other reports that refresh from Project Online endpoints will no longer be able to retrieve new source data after retirement. Report files and previously imported data may remain available if stored elsewhere, but their connections, semantic models, credentials, refresh schedules and security rules must be redirected and validated.
Does every completed project need to be migrated?
No. Many organizations archive completed projects instead of migrating them into the new system. A common approach is to migrate active projects and archive older history, but the cutoff should be based on operational, reporting, legal, contractual and retention requirements.
Can migration be done in phases?
Yes. A phased transition may use Project Online as the source system only until its retirement. During any coexistence period, ownership and update rules must prevent conflicting changes between Project Online and the target platform.
How long does migration take?
Timelines vary widely. Simple environments may take weeks, while complex enterprise setups can take several months. Factors include integrations, customizations, data quality, testing and training. A readiness assessment provides the most accurate estimate.
How much does migration cost?
Costs depend on environment size, complexity and target solution. Key drivers include number of projects, custom configuration, integrations, reporting needs, licensing and training. A focused archive engagement may cost less than a full platform replacement; scope and retention needs determine the effort.
How soon should we start?
Immediately. The first step is to inventory the current environment, including projects, workflows, reports, integrations and data requirements. Then define business needs, evaluate replacement options and run a pilot migration. If time is limited, prioritize securing and exporting critical data first.
Let’s plan your next step
Request a Project Online Retirement Readiness Assessment
A clear view of your risks. A practical path forward.
Tell us about your PWA sites and the reports, workflows, integrations and project processes your business depends on. We’ll help define priorities for migration, redesign or archive.
sales@bsuite365.com